Field

(Bio)GeoProbe

| |

Description:

Richter operating BioGeoprobe along the lower Roanoke River. We cored and sampled sediments sometimes >5 meters.
2005

Author:

Year: 2005


Original Scale | View Gallery

Landuse plot C3

Description:

Cultivated plot

Author: Michael Hofmockel

Year: 0


Original Scale | View Gallery

repacking lysimeter auger hole

| |

Description:

Repacking soil gas well
2003

Author:

Year: 2003


Original Scale | View Gallery

Soil profile extracted

| | |

Description:

Soil layed out in order while digging to 200cm

Author:

Year: 0


Original Scale | View Gallery

lysimeter installation

|

Description:

Paul Heine, Dan Richter Augering deeply into subsoils.
Gas well installation
2003

Author:

Year: 0


Original Scale | View Gallery

Canopy

|

Description:

Open canopy June 2004

Author: Michael Hofmockel

Year: 0


Original Scale | View Gallery

Calhoun plots 2004

|

Description:

June 2004 block 3

Author: Michael Hofmockel

Year: 0


Original Scale | View Gallery

Lysimeter storage vessels

|

Description:

Lysimeter storage vessels
June 2004

Author:

Year: 2003


Original Scale | View Gallery

Lysimeter collections

| |

Description:

Jian Wei Li collecting lysimeter samples in block 1
June 2004

Author:

Year: 2004


Original Scale | View Gallery

Calhoun Forest

Description:

1998, Michael Hofmockel, Block 2

Author: Michael Hofmockel

Year: 0


Original Scale | View Gallery
Syndicate content